At the foreground of the image there is orange plastic temporary fences with red and white tape along the top. These fences are positioned in a medium sized circular shape. It is a construction site with a construction worker wearing orange high vis and a red helmet stood in the middle, blurred in the background. On his left, there is a 360 excavator operator digging machine, controlled by someone wearing yellow high vis. On the nearest fence, there is a pink and purple banner which says

Truespeed invests £22 million into South West full fibre rollout

Bath-based Truespeed has announced a £22 million investment across multiple…